The G40 Floors & Showers

Custom Showers

Waterproofed, custom-tiled showers with niches, benches, and curbless options.

A shower is the hardest tile job in the house. We build it right: full demo, new backer board, Schluter or RedGard waterproofing, pre-sloped pan, flood test, then tile. Niches, benches, linear drains, curbless entries, and glass-ready walls.

Plain fiberglass tub to green zellige tub surround — After
Plain fiberglass tub to green zellige tub surround — Before
BeforeAfter

Plain fiberglass tub to green zellige tub surround

Before: builder-grade fiberglass tub surround and a gray box of a bathroom. After: glossy green zellige-look tile stacked floor to ceiling, Calacatta Viola marble niche, matte black fixtures, black penny-round floor, brass sconce, oak floating vanity. Same tub footprint.

Dated shower to gray large-format with frameless glass — After
Dated shower to gray large-format with frameless glass — Before
BeforeAfter

Dated shower to gray large-format with frameless glass

Before: worn 12x24 tile, small mosaic pan, popcorn ceiling, hanging wire caddy. After: 24x48 gray marble-look porcelain, frameless glass door with black hardware, ceiling rain head plus handheld, recessed niche, marble-look curb, textured gray pan, new lighting.

Marble-look walk-in shower with floating benchFinished

Marble-look walk-in shower with floating bench

24x48 marble-look porcelain on the walls, gray pebble mosaic floor, linear drain, floating bench, two shower heads, transom window kept for daylight.

White vertical-stack shower with penny tile floorFinished

White vertical-stack shower with penny tile floor

Glossy 3x12 white tile stacked vertically, white penny-round mosaic pan, matte black square drain, solid curb, terrazzo-look bathroom floor.

  1. Master bath remodel, start to finish — Day 1. Floor set and level. Cement board and waterproofing up. First rows of wall tile going on with spacers.Step 1

    Day 1. Floor set and level. Cement board and waterproofing up. First rows of wall tile going on with spacers.

  2. Master bath remodel, start to finish — Wide view from the hallway. Shower wall tiled to the niche, half wall framed, floor protected while walls go up.Step 2

    Wide view from the hallway. Shower wall tiled to the niche, half wall framed, floor protected while walls go up.

  3. Master bath remodel, start to finish — Niche framed in and tiled with hex marble mosaic. Valve and head rough-ins cut clean.Step 3

    Niche framed in and tiled with hex marble mosaic. Valve and head rough-ins cut clean.

  4. Master bath remodel, start to finish — Walls complete to the ceiling. Pre-sloped pan tiled in hex mosaic. Half wall framed for frameless glass.Step 4

    Walls complete to the ceiling. Pre-sloped pan tiled in hex mosaic. Half wall framed for frameless glass.

  5. Master bath remodel, start to finish — Grouted and cleaned. Window wall wrapped in tile. Ready for fixtures and glass.Step 5

    Grouted and cleaned. Window wall wrapped in tile. Ready for fixtures and glass.

  6. Master bath remodel, start to finish — View from the door. Tile runs floor to ceiling around the window and into the water closet.Step 6

    View from the door. Tile runs floor to ceiling around the window and into the water closet.

Master bath remodel, start to finish

Full gut. New 24x48 porcelain floor, 12x24 marble-look walls to the ceiling, recessed niche with hex marble mosaic, hex mosaic shower pan, half wall ready for glass.

Common questions

How long is my shower out of service?

Most showers take 4 to 7 working days from demo to usable.

Do you do the plumbing?

We set valves and drains in coordination with a licensed plumber when required.

Do you offer curbless showers?

Yes, when the subfloor allows a recessed pan.

Let's talk about your floors.

Free estimate. Same-day reply. English or Spanish.

Call Text WhatsApp